A SUMMARIZE REPORT ON 2019 ROAD CONDITION

Table I; Composition of the Trunk Road Network by Surface Category (2019)

Surface Category Length (km) Percentage (%)
Cement Concrete 38.6 0.3
Asphaltic Concrete 2,656.92 17.3
Surface Dressed 5,929.90 38.6
Gravel 5,524.80 36.0
Sub Total (Surveyed) 14,150.22 92.1
Under Construction 722.78 4.7
Missing Link 487.00 3.2
Grand Total 15,360.00 100.0

Composition of the Trunk Road Network by Surface Category

pie_chart.jpg Figure 1: Composition of the Trunk Road Network by Surface Category

For both Paved and Gravel roads surveyed, the overall 2019 Road Condition Score computed for homogeneous sections stands at 32% Good, 49% Fair and 19% Poor; as shown in Table II below:

Table II; 2019 Road Surface Condition Mix (National)

Condition Description Length (km) Percentage (%)
GOOD 4,548.20 32
FAIR 6,954.50 49
POOR 2,647.50 19
TOTAL 14,150.20 100

Table III; 2019 Road Surface Condition Mix (Regional)

Region Good Fair Poor Total
km % km % km %
Ashanti 369.7 22% 783.1 48% 492.4 30% 1,645.2
Brong Ahafo 720.8 36% 968.2 48% 316.4 16% 2,005.4
Central 255.3 22% 701.5 60% 205.4 18% 1,162.2
Eastern 671.9 45% 638.9 43% 179.6 12% 1,490.4
Greater Accra 95.3 23% 271.0 64% 54.2 13% 420.5
Northern 917.4 32% 1,509.9 53% 433.1 15% 2,860.4
Upper East 143.1 24% 382.8 65% 64.2 11% 590.1
Upper West 302.0 29% 578.0 55% 179.5 17% 1,059.5
Volta 352.0 28% 589.3 47% 314.5 25% 1,255.8
Western 720.7 43% 531.8 32% 408.2 25% 1,660.7
Total 4,548.2 32% 6,954.5 49% 2,647.5 19% 14,150.2

The 2019 Road Condition Mix of 32% Good, 49% Fair and 19% Poor suggests the road condition has deteriorated significantly compared to the last four (4) years. The current condition mix lags far behind the projected target of 70% Good, 20% Fair and 10% Poor to be achieved by 2037, as contained in the GHA’s 20-Year Strategic Plan (2017 – 2037). This may be attributed to inadequate budget funding, late procurement and commencement of road maintenance projects, misplaced maintenance intervention selection and prioritization, suspension of projects due to delayed or non-payment of contractors among others as the possible factors.

Present Statistics of The Trunk Road Network
The PMMP software was used to provide information on the statistics of the trunk road network surveyed in the 2019 survey year. The lengths of roads by surface type in the various regions were obtained (Table IV).


Table IV; 2019 Surveyed Trunk Road Network Statistics (Regional)

Region Roads Surveyed in 2019 Total Length
Asphalt Surface Treated Rigid Gravel
km km km km km
Ashanti 525.1 756.2 363.9 1,645.2
Brong Ahafo 349.7 1,010.0 645.7 2,005.4
Central 307.0 537.0 318.2 1,162.2
Eastern 191.4 831.7 467.3 1,490.4
Greater Accra 253.3 119.5 38.6 9.1 420.5
Northern 300.9 838.2 1,721.3 2,860.4
Upper East 70.2 156.8 363.1 590.1
Upper West 53.4 223.2 782.9 1,059.5
Volta 147.1 972.2 136.5 1,255.8
Western 458.8 485.1 716.8 1,660.7
Total 2,656.9 5,929.9 38.6 5,524.8 14,150.2

Road Surface Condition Mix for the Surveyed Network


Table V; 2019 Road Surface Condition Mix for different surface types surveyed.

Surface Type Condition Description Total Length
Good Fair Poor
km % km % km % km
Rigid 0.0 0.0 0.0 0.0 38.6 100 38.6
Asphalt 1,047.4 39 1,472.3 55 137.2 5 2,656.9
Surface Treated 2,404.9 41 2,803.8 47 721.2 12 5,929.9
Gravel 1,095.9 20 2,659.1 48 1,769.8 32 5,524.8
Total 4,548.2 32 6,935.2 49 2,666.8 19 14,150.2

For supplementary information please refer to this table

Office Address :

HEAD OFFICE
P.O.Box 1641
Ministries
Accra - Ghana
03039-67364 (Reception)
03202-961616
03202-961620
ce@highways.gov.gh