Eastern Region |
Upgrading of Asakraka Town Roads |
8.00 |
Reliance & Logistic Const. Ltd |
2020-06-08 |
2022-07-06 |
2022-07-06 |
31,258,577.95 |
31,258,577.95 |
N/A |
|
Eastern Region |
Upgrading of Abetifi Town Roads |
5.13 |
Juttap Co. Ltd. |
2020-09-23 |
2021-09-24 |
2021-09-24 |
14,697,422.40 |
14,697,422.40 |
N/A |
|
Ahafo Region |
Upgrading of Bediako-Kasapin-Camp 15 Road (km 0+000-45+000) |
45.00 |
Kofi Job Company Limited |
2019-09-12 |
2022-09-12 |
None |
182,597,183.95 |
N/A |
105,256,442.63 |
|
Ahafo Region |
Upgrading of Nobekaw-Sankore Road (km 0+000-11+500) |
11.50 |
Buadac Company Limited |
2020-02-20 |
2022-02-18 |
None |
50,883,964.61 |
N/A |
15,731,537.26 |
|
Ashanti Region |
Upgrading of Trabuom – Nwiniso No.1 – Moseaso – Manso Atwere Road (km 0.00 – 16.00) |
16.00 |
Hallmark Civil Eng. Ltd |
2019-07-04 |
2021-07-03 |
None |
57,350,586.11 |
57,350,586.11 |
10,772,907.44 |
|
Ashanti Region |
Upgrading of Nsuta - Beposo, Lot 3 |
7.00 |
Memphis Metropolitan Limited |
2019-09-05 |
2021-09-04 |
None |
25,960,940.06 |
25,960,940.06 |
11,234,198.38 |
|
Bono East Region |
Upgrading of Kintampo - Prang Road (Km 21.7 -49.8) - BOE LOT 2 |
28.1 |
Jo-Mint Associates Ltd |
2020-04-17 |
2022-04-16 |
None |
60,823,682.96 |
N/A |
N/A |
|
Ahafo Region |
Upgrading of Akrodie-Sayereso Road (km 0+000-20+000) |
20.00 |
Kingspok Construction Limited |
2020-03-18 |
2022-09-18 |
None |
42,507,569.34 |
N/A |
11,428,356.58 |
|
Ahafo Region |
Upgrading of Akrodie-Sayereso Road (km 20+000-40+600) |
20.60 |
Semaa Construction Eng. Limited |
2020-03-18 |
2022-09-18 |
None |
55,677,298.49 |
N/A |
N/A |
|
Ahafo Region |
Upgrading of Dormaa Ahenkro - Babianiha Road (km 0.0-20.0), Atronie - Mim Road (km 17.0-33.9) & Ahafo Kenyase - Asukese - Mim Road (km 0.0-26.0) |
62.90 |
New Modern World Co. Limited |
2020-06-04 |
2022-12-04 |
None |
57,607,440.21 |
N/A |
N/A |
|
Western Region |
Upgrading of Adesu - Afransie - Jukwa - Ankwaoso Road (55.55Km) including the construction of 2No. 30m Span Concrete Bridge |
55.55 |
Ghacos Limited |
2020-08-11 |
2023-08-10 |
None |
67,520,000.00 |
N/A |
N/A |
|
Western Region |
Upgrading of Sureso - Aboi Junction Road (Km 0 - 15.6) - Lot 2 |
15.60 |
Highbrains Limited |
2020-04-16 |
2022-04-15 |
None |
79,067,510.97 |
N/A |
N/A |
|
Western Region |
Upgrading of Bogoso - Insu Siding - Huni Valley Road (Km 0 - 26) - Lot 4 |
26.00 |
Wilhem Limited |
2020-03-19 |
2022-09-19 |
None |
172,903,132.09 |
N/A |
N/A |
|
Western Region |
Upgrading Opon Valley Junction - Opon Valley - Agyempoma Road (Km 0 - 10) |
10.00 |
Wilhem Limited |
2020-03-19 |
2022-03-19 |
None |
39,741,847.67 |
N/A |
N/A |
|
Western North Region |
Upgrading of Akontombra - Bodi Road (Km 15.7 – 19.1) |
3.4 |
Klogg Gh Ltd |
2020-07-01 |
2021-04-01 |
None |
14,830,000.00 |
N/A |
N/A |
|
Volta Region |
Upgrading of Bame - Dzolokpuita (km 0. 0 - 16.0 ) |
16 |
Greenhouse Int. Development (Gh) Limited |
2011-07-29 |
2018-06-28 |
2021-03-28 |
40,281,325.26 |
40,281,325.26 |
41,417,103.18 |
|
Volta Region |
Upgrading of Golokwati -Wli Road (KM 10 - 27) |
17 |
Saa & Sarad Ltd. |
2016-11-15 |
2018-05-14 |
2021-05-14 |
45,743,572.04 |
80,216,723.40 |
59,253,633.60 |
|
North East Region |
Upgrading of Nalerigu - Nakpanduri Road (Km 0.0 - 25.8.0), Bende - Bunkpurugu Road (Km 0.0 - 15.2) and Resealing of Nakpanduri - Bende Road (Km 0.0 - 27.0) Total Length 68.0Km - NE LOT 1 |
68.0 |
City (Ghana) Construction Co. Ltd |
2020-04-14 |
2023-04-14 |
None |
216,610,596.80 |
N/A |
4,324,310.72 |
|
North East Region |
Upgrading of Wulugu - Wiase Road (Km 0.0 - 35.0) -NE LOT 3 |
35.0 |
City (Ghana) Construction Co. Ltd |
2020-03-04 |
2023-03-03 |
None |
144,296,000.00 |
N/A |
3,187,907.47 |
|
Northern Region |
Upgrading of Tamale-Nanton-Karaga Road (km 13.0-74.5) |
61.5 |
Maripoma Enterprise Limited |
2016-08-15 |
2019-08-14 |
None |
118,252,561.77 |
N/A |
19,719,480.22 |
|
Northern Region |
Upgrading of Sakpiegu-Chereponi Road (km 0-50) |
50.0 |
Greenhouse Int. Dev't (GH) Limited |
2016-08-15 |
2019-08-15 |
None |
120,137,164.14 |
N/A |
13,502,971.38 |
|
Northern Region |
Upgrading of Sakpiegu-Chereponi Road (km 50-100) |
50.0 |
Kasmida Ventures Limited |
2016-11-24 |
2019-11-23 |
None |
115,234,080.86 |
N/A |
8,288,103.74 |
|
Northern Region |
Upgrading of Tamale-Daboya Road (km 29.0-59.2) Lot 2 |
30.2 |
Maripoma Enterprise Limited |
2020-11-16 |
2023-11-15 |
None |
119,657,337.41 |
N/A |
N/A |
|
Northern Region |
Upgrading of Salaga-Bimbilla Road (km 2.0-73.0) |
71.0 |
New Modern World Co. Limited |
2019-07-29 |
2023-01-09 |
None |
240,747,817.67 |
N/A |
95,602,446.11 |
|
Northern Region |
Upgrading of Tolon Town Roads (5.1km) |
5.1 |
GOP Limited |
2019-11-05 |
2021-05-04 |
None |
24,199,148.76 |
N/A |
N/A |
|
Northern Region |
Upgrading of Kumbungu-Tolon Road (km 0.0-10.0) |
10.0 |
Naagamni Const. Limited |
2020-03-31 |
2022-03-30 |
None |
29,297,735.46 |
N/A |
3,335,161.17 |
|
Northern Region |
Upgrading of Kumbungu-Nawuni Road (km 0.0-17.1) |
17.1 |
U-Comm Limited |
2016-09-15 |
2018-09-14 |
None |
31,651,772.78 |
N/A |
12,574,885.26 |
|
Northern Region |
Upgrading of River Bank-Nakpali-Zabzugu Road (km 0.0-57.8)-NR Lot1 |
57.8 |
Jiangxi Nonferrous Eng & Const. Co. Ltd. |
2020-03-17 |
2023-03-16 |
None |
206,394,776.28 |
N/A |
7,190,745.33 |
|
Northern Region |
Upgrading of Gushiegu-Nalerigu Road (km 0.0-52.0)-NR-Lot 2 |
52.0 |
Maripoma Enterprise Limited |
2020-03-03 |
2023-09-02 |
None |
198,059,854.63 |
N/A |
16,584,198.81 |
|
Northern Region |
Upgrading of Salaga-Ekumdipe-Kpandai Road (km 26.7-45.3) and Kpandai-Nkanchina Road (10.8km)-SAV-Lot 2 |
29.4 |
Jiangxi Nonferrous Eng & Const. Co. Ltd. |
2020-03-05 |
2023-03-03 |
None |
125,458,861.78 |
N/A |
8,153,605.15 |
|
Ashanti Region |
Upgrading of Ahenema Kokoben Town Roads (4.53km) - Frimps Filling Station Roads, Medi-Moses Internal Roads and Other Access Roads, Lot 1 |
4.53 |
Agyakot Company Limited |
2020-09-15 |
2021-09-14 |
None |
27,232,731.64 |
N/A |
27,232,731.64 |
|
Ashanti Region |
Upgrading of New Edubiase - Anomabu Road (km 10.0 - 32.0) |
22.00 |
Cymain Ghana Limited |
2020-03-30 |
2022-03-29 |
None |
62,654,604.10 |
62,654,604.10 |
N/A |
|
Ashanti Region |
Upgrading of Ahenema Kokoben Town Roads (7.22km), Lot 2 |
7.22 |
Hardwick Limited |
2020-09-15 |
2021-09-14 |
None |
26,003,720.70 |
26,003,720.70 |
N/A |
|
Ashanti Region |
Upgrading of Nsuta Town Roads (5.0km) |
5.00 |
Highbrains Limited |
2019-09-15 |
2021-09-14 |
None |
18,202,658.36 |
18,202,658.36 |
N/A |
|
Ashanti Region |
Upgrading of Effiduase - Senchi - Juansa Road (km 10.2 - 20.0), Lot 1 |
9.80 |
Jewuu Construction Ltd |
2020-09-01 |
2021-08-30 |
None |
25,424,498.36 |
25,424,498.36 |
N/A |
|
Ashanti Region |
Upgrading of Ahenema Kokoben - Sokoban Road (5.75km) |
5.75 |
Kenstep Limited |
2020-09-15 |
2021-09-14 |
None |
30,971,509.96 |
30,971,509.96 |
N/A |
|
Ashanti Region |
Upgrading of Mampong – Kofiase Road (km 0.0-14.0), Lot 2 |
14.00 |
Kofi Job Company Limited |
2019-09-05 |
2021-09-04 |
None |
53,637,690.76 |
85,250,001.23 |
36,128,735.05 |
|
Ashanti Region |
Upgrading of Ofoase Kokoben – Adjamesu Road (9.0km) |
9.00 |
M. Gyebi Co. Ltd |
2019-04-29 |
2021-04-28 |
None |
36,627,481.83 |
36,627,481.83 |
34,024,497.93 |
|
Ashanti Region |
Upgrading of Santasi – Bekwai bypass (20km) |
20.00 |
Northen Mines & Quarry Ltd |
2019-04-29 |
2021-04-28 |
None |
71,231,085.21 |
71,231,085.21 |
17,643,236.73 |
|
Ashanti Region |
Upgrading of Nweneso No. 2 - Nweneso No. 3 road (km 0.0 - 3.5), Lot 1 |
3.50 |
Blessing TM Limited |
2020-02-01 |
2022-01-31 |
None |
14,998,998.82 |
N/A |
N/A |
|
Ashanti Region |
Upgrading of Kojo Nkwanta - Tutuka Road (km 0.00-31.50) |
31.50 |
Erdmac Company Ltd |
None |
None |
None |
27,248,323.15 |
N/A |
N/A |
|
Ashanti Region |
Upgrading of Bepotenten - Nemereso - Wromanso Road (29.65km) and Upgrading of Dome - Hia Road (26.0km) |
52.95 |
Nathawo Properties and Inv, Ltd |
None |
None |
None |
41,174,369.91 |
N/A |
N/A |
|
Bono Region |
Upgrading of Menji - Bui Road (KM 0+000 - 30+000) |
30.00 |
Doncross Ventures |
2020-04-04 |
2022-04-05 |
None |
82,289,563.38 |
N/A |
22,744,022.59 |
|
Bono Region |
Upgrading of Sampa - Jinini Road (KM 0+000 - 31+500) |
31.50 |
J. Adom Limited |
None |
2020-05-14 |
2022-05-13 |
115,704,346.99 |
N/A |
28,951,409.42 |
|
Bono Region |
Upgrading of Odumase - Adentia - Badu Road (KM 0+000 - 30+170) |
30.17 |
Alexiboam Company Limited |
2019-09-11 |
2022-03-11 |
None |
86,461,372.95 |
N/A |
27,253,418.38 |
|
Bono Region |
Upgrading of Wenchi Town Roads (10Km) |
10.00 |
P.M.C. Africa Limited |
2016-04-15 |
2018-04-15 |
2020-08-15 |
25,158,885.15 |
N/A |
8,342,123.30 |
|
Bono Region |
Upgrading of Debibi - Sampa Road (KM 0+000 - 8+000) |
8.00 |
P.M.C. Africa Limited |
2020-04-07 |
2022-04-06 |
None |
26,955,322.20 |
N/A |
N/A |
|
Bono Region |
Upgrading of Drobo Town Roads (5.40Km) |
5.40 |
Baahbentuh Company Limited |
2020-12-09 |
2022-08-08 |
None |
14,912,330.60 |
N/A |
3,922,384.54 |
|
Bono Region |
Upgrading of Odumase - Seikwa Nkwanta Road (KM 0+000 - 20+000) |
20.00 |
J.B.C. Investment (GH) Limited |
2020-10-21 |
2022-10-20 |
None |
42,303,189.36 |
N/A |
N/A |
|
Bono Region |
Upgrading of Odumase - Seikwa Nkwanta Road (KM 20+000 - 44+000) |
24.00 |
Ba-Iseng Limited |
2020-10-21 |
2022-10-20 |
None |
64,824,223.68 |
N/A |
N/A |
|
Bono Region |
Upgrading of Nkrankwanta - Kaase Road (KM 1+000 - 10+000), Remedial works on Dormaa Ahenkro - Nkrankwanta Road (KM 30+000 - 36+000) and Upgrading of Nkrankwanta Town Roads (3Km) |
18.00 |
Achwek Limited |
2020-07-16 |
2022-01-15 |
None |
11,927,003.99 |
N/A |
1,219,563.98 |
|
Bono Region |
Upgrading of Dormaa Ahenkro - Babianiha (KM 0+000 - 20+000), Atronie - Mim (KM 17+000 - 33+900) and Ahafo Kenyasi - Asukese Mim (KM 0+000 - 26+000) Roads |
62.50 |
New Modern World Company Limited |
2020-06-12 |
2022-12-11 |
None |
57,607,440.21 |
N/A |
N/A |
|
Bono Region |
Upgrading of Babianiha - Kwame Pra Road (KM 0+000 - 22+000) |
22.00 |
Alexiboam Company Limited |
None |
None |
None |
67,545,555.34 |
N/A |
N/A |
|
Bono East Region |
Upgrading of Atebubu - Kwame Danso - Kwadwokrom Road (Km 0 - 35.0) - BOE LOT 1 |
35 |
Justmoh Construction Limited |
2020-04-22 |
2022-10-22 |
None |
108,603,391.94 |
N/A |
N/A |
|
Bono East Region |
Upgrading of Dromankese Town Roads |
3.95 |
Aba-Baram Co. Ltd |
None |
None |
None |
17,874,894.74 |
N/A |
N/A |
|
Ahafo Region |
Upgrading of Atronie-Mim Road (km 0+000-17+000) |
17.00 |
Alexiboam Company Limited |
2019-09-11 |
2022-03-11 |
None |
50,965,279.04 |
N/A |
18,421,574.16 |
|
Ahafo Region |
Upgrading of Tepa Jnc - Goaso Road (km 55.8 - 63.3) |
7.50 |
Kofi Job Company Limited |
2015-04-15 |
2016-10-17 |
None |
18,217,974.92 |
N/A |
14,942,310.89 |
|
Western Region |
Upgrading of Damang - Atieku - Twifi Anyinase Road (Km 0.0 - 41.0) and Daboase Jnc. - Atieku Road (Km 59.0 - 66.0) |
48.00 |
Justmoh Const. Limited |
2020-06-23 |
2022-06-22 |
None |
46,400,000.00 |
N/A |
N/A |
|
Western North Region |
Upgrading of Selected Roads in Sefwi Juaboso (14.43KM) |
14.3 |
Buadac Company Limited |
None |
None |
None |
N/A |
N/A |
N/A |
|
Western North Region |
Upgrading of Sefwi Wiawso - Akontombra Road (Km 0.0 - 15) - Lot 2 |
15 |
Buadac Company Limited |
2020-02-06 |
2021-10-19 |
None |
42,500,000.00 |
N/A |
4,400,000.00 |
|
Western North Region |
Upgrading of Akontombra - Bodi Road (Km 0 – 15) |
15 |
Hodna Const. Limited |
2015-05-25 |
2016-11-24 |
2017-03-23 |
32,300,000.00 |
N/A |
30,080,000.00 |
|
Western North Region |
Upgrading of Adjoafua - Oseikojokrom Road (Km 0 – 16) |
16 |
Midwest Contract Works |
2015-05-25 |
2016-11-24 |
None |
55,000,000.00 |
N/A |
36,420,000.00 |
|
Western North Region |
Upgrading of Anyinabrem - Sui – Bodi Road ( Km 0 – 20) |
20 |
Midwest Contract Works |
2015-05-25 |
2016-11-24 |
None |
39,100,000.00 |
N/A |
31,760,000.00 |
|
Western North Region |
Upgrading of Akontombra - Bodi Road ( Km19.1 -22.4) Lot 2 |
3.3 |
Sampric Hap Gh Ltd. |
2020-08-01 |
2021-05-01 |
None |
14,830,000.00 |
N/A |
N/A |
|
Western North Region |
Upgrading of Yawmetwa Junction - Yawmetwa - Ahemakrom (Km 0 - 44) |
44 |
Cymain Ghana Limited |
2020-11-05 |
2023-11-04 |
None |
57,300,000.00 |
N/A |
N/A |
|
Upper East Region |
Upgrading of Chuchuliga - Sandema - Wiesi Road (40.0km) |
40 |
Myturn Limited |
2016-09-16 |
2019-03-15 |
2021-12-18 |
98,796,910.53 |
N/A |
18,949,544.78 |
|
Upper East Region |
Upgrading of Bongo - Feo - Namong Road (km 0 - 20.2) |
20.2 |
Ishdaco Ltd |
None |
None |
None |
99,531,537.57 |
N/A |
N/A |
|
Upper West Region |
Upgrading of Tumu - Han - Lawra Road (60km) |
60 |
Greenhouse Int. Development (Gh) Limited |
2016-08-10 |
2019-08-09 |
None |
181,914,765.33 |
N/A |
102,568,207.12 |
|
Upper West Region |
Upgrading of Nadowli-Lawra-Hamile Road (km 45 - 87.6), Lot 8 |
42.6 |
P & W Ghanem Ltd. |
2008-06-11 |
2010-06-10 |
2019-11-11 |
12,050,000.00 |
14,926,945.19 |
26,305,752.06 |
|
Greater Accra Region |
Upgrading of Adjeikojo-Ashalley Botwe Road (10.5km) |
10.50 |
Abdelco Limited |
2016-11-02 |
2018-11-02 |
2020-10-19 |
34,230,000.00 |
N/A |
6,210,000.00 |
|
Greater Accra Region |
Upgrading of Oyibi-Ashaiman Road 11.7 km Lot 3 |
11.7 |
Maripoma Entreprise Limited |
2012-12-20 |
2013-12-19 |
2016-10-19 |
7,480,000.00 |
25,150,000.00 |
16,180,000.00 |
|
Oti Region |
Upgrading of Eastern Corridor Roads -Lot4A(0-50KM) Nkwanta - Oti Damanko |
50.3 |
CHINA JIANXI |
2011-11-22 |
2013-11-21 |
None |
113,492,494.83 |
151,099,135.61 |
99,186,844.55 |
|
Oti Region |
Upgrading of Eastern Corridor Roads -Lot4B(50+300-62+300KM) Nkwanta - Oti Damanko |
12.00 |
FIRST SKY LTD |
2016-09-02 |
2017-12-31 |
None |
99,186,844.55 |
99,186,844.55 |
13,546,970.10 |
|
Volta Region |
Upgrading of Adaklu Abuadi-Waya(5.0km); Access Roads to the District Assembly,SHS & Others (3.6km) |
8.6 |
Delovely Co Ltd |
2019-08-06 |
2021-02-05 |
2021-02-05 |
32,086,352.37 |
32,086,352.37 |
1,474,705.19 |
|
Volta Region |
Upgrading of Juapong - Adidome Road (km 0.0 - 54.5) |
54.5 |
Joshob Construction Company Limited |
2016-07-28 |
2019-07-27 |
2019-07-27 |
139,337,389.03 |
139,337,389.03 |
106,408,556.41 |
|
Volta Region |
Upgrading Ho - Adidome Road - LOT 1: (Km 67 - 79.8) |
12.8 |
Ussuya (GH) Ltd |
2010-06-17 |
2011-03-16 |
2014-12-31 |
22,388,850.96 |
39,460,000.00 |
25,780,000.00 |
|
Central Region |
Upgrading of Twifo Praso - Assin Fosu Road (20Km) |
20 |
Erdmac Co. Ltd. |
None |
None |
None |
N/A |
N/A |
N/A |
|
Central Region |
Upgrading of Asafana - Kwaman - Ayeldu Road (9km) |
9 |
Top Modular Impression Company Ltd |
2020-03-12 |
2021-03-11 |
None |
14,363,135.78 |
N/A |
N/A |
|
North East Region |
Upgrading of Yagaba - Mankarigu Road (Km 12.0 - 24.0) and Mankarigu - Nawuni Road (Km 0.0 - 17.5) -NE LOT 4 |
29.5 |
Mawums Ltd |
2020-02-26 |
2022-02-25 |
None |
116,715,223.43 |
N/A |
61,261,187.74 |
|
North East Region |
Upgrading/ Resealing of Yzezi Junction - Yagaba Road; Upgrading of Yagaba - Kubori Road (13.0Km); and Upgrading of Kubori - Zanwora Road (6.4Km) - Addendum |
31.4 |
Mawums Ltd |
2020-05-22 |
2023-05-21 |
None |
93,740,577.76 |
N/A |
15,450,961.60 |
|
North East Region |
Upgrading of Nalerigu Town Roads |
4.0 |
M.M. Iddrisu Company Ltd |
2016-11-08 |
2017-11-07 |
2021-01-07 |
6,544,351.94 |
N/A |
2,625,964.78 |
|
Savannah Region |
Upgrading of Salaga-Ekumdipe-Kpandai Road (km 3+700 - 26+700) SAV. Lot 1 |
23 |
Jiangxi Nonferrous Constr. Co. Ltd. |
2020-03-05 |
2022-08-03 |
None |
100,200,000.00 |
N/A |
12,210,000.00 |
|
Savannah Region |
Upgrading of Daboya-Mankarigu (km 0-10) |
10 |
Limerica Ghana Ltd. |
2016-11-07 |
2018-11-06 |
None |
34,700,000.00 |
N/A |
22,160,000.00 |
|
Savannah Region |
Upgrading of Busunu-Daboya Road (53km) |
53 |
Logistics Support Services Ltd. |
2015-01-01 |
2017-06-30 |
None |
42,200,000.00 |
N/A |
N/A |
|
Savannah Region |
Upgrading of Daboya-Mankarigu (km 30.0-63.1) - SAV Lot 5 |
33.1 |
Maripoma Entreprise Limited |
2020-03-10 |
2022-08-10 |
None |
125,100,000.00 |
N/A |
27,910,000.00 |
|
Savannah Region |
Upgrading of Daboya-Mankarigu (km 10.0-30.0) - SAV Lot 4 |
20 |
Myturn Limited |
2020-03-19 |
2022-03-18 |
None |
80,100,000.00 |
N/A |
9,220,000.00 |
|
Ashanti Region |
Upgrading of Banka Junction – Gyadem Road (7km) |
7.00 |
Comet Construction Limited |
2016-09-07 |
2018-03-07 |
None |
14,455,042.70 |
14,455,042.70 |
3,038,819.66 |
|
Ashanti Region |
Upgrading of Banka Junction – Gyadem Road (km 7.0 - 13.6) |
6.60 |
Comet Construction Limited |
2015-05-07 |
2019-05-30 |
None |
15,920,540.64 |
15,920,540.64 |
1,992,229.57 |
|
Ashanti Region |
Upgrading of Kwamang - Jeduako - Aframso Road (km 0.00 - 5.00), Lot 1 |
5.00 |
Boatway Company Limited |
None |
None |
None |
14,992,903.41 |
N/A |
N/A |
|
Ashanti Region |
Upgrading of Kwamang - Jeduako - Aframso Road (km 5.00 - 10.00), Lot 2 |
5.00 |
La Prime Construction |
None |
None |
None |
14,997,527.49 |
N/A |
N/A |
|
Ashanti Region |
Upgrading of Agogo - Onyemso Road (km 4.50 - 16.50), Lot 2 |
12.00 |
Pio - Den Limited |
None |
None |
None |
14,989,224.42 |
N/A |
N/A |
|
Bono Region |
Upgrading of Berekum - Seikwa Road (KM 0+000 - 34+600) |
34.60 |
J. Adom Limited |
2011-12-13 |
2013-12-12 |
2017-12-31 |
44,866,479.76 |
N/A |
97,391,457.76 |
|
Bono Region |
Upgrading of Gambia No. 2 - Kyeremasu Road (KM 0+000 - 20+000) |
20.00 |
Kofi Job Company Limited |
2015-04-04 |
2016-10-14 |
None |
28,818,891.39 |
N/A |
20,238,664.89 |
|
Bono Region |
Upgrading of Gambia No. 2 - Kyeremasu Road (KM 20+000 - 30+000) |
10.00 |
Kofi Job Company Limited |
2016-04-03 |
2017-04-09 |
None |
49,184,000.38 |
N/A |
35,279,936.49 |
|
Bono East Region |
Upgrading of Atebubu - Kwame Danso - Kojokrom Road (Km 30.0 - 100.0) - (Upgrading of Boadinkra - Kojokrom km65-100, Phase II) |
35 |
Justmoh Construction Limited |
2015-12-10 |
2018-12-09 |
None |
80,454,394.29 |
N/A |
17,060,696.43 |
|
Bono East Region |
Upgrading of Kintampo - New Longoro Road (Km 0.0 - 15.0) |
15 |
Cymain Ghana Limited |
2012-12-20 |
2014-06-20 |
2016-12-30 |
31,295,911.98 |
N/A |
49,283,407.21 |
|
Bono East Region |
Upgrading of Prang - Kintampo Road (Km 10.0 - 21.0) Addendum No. 1 to Prang - Kintampo (Km 0.0 - 10.0) |
11 |
Dynamic Star Co. Limited |
2011-08-22 |
2014-12-21 |
2015-06-21 |
7,402,983.03 |
11,503,032.27 |
16,697,073.53 |
|
Bono East Region |
Upgrading of Prang - Kintampo Road (Km 21.0 - 31.0) Addendum No. 2 to Prang - Kintampo (Km 0.0 - 10.0) |
10 |
Dynamic Star Co. Limited |
2014-06-20 |
2015-12-20 |
None |
10,619,432.81 |
N/A |
8,114,038.96 |
|
Bono East Region |
Upgrading of Prang - Kintampo Road (Km 31.0 - 36.0) Addendum No. 3 to Prang - Kintampo (Km 0.0 - 10.0) |
5 |
Dynamic Star Co. Limited |
2016-08-18 |
2017-08-17 |
None |
8,996,873.45 |
N/A |
3,889,729.07 |
|
Bono East Region |
Upgrading of Prang - Kintampo Road (Km 36.0 - 66.0) |
30 |
Amoh Prempeh Co.Ltd |
2016-08-02 |
2018-08-01 |
None |
69,859,248.24 |
N/A |
6,552,167.29 |
|
Western North Region |
Upgrading ofAkontombra - Bodi Road ( Km22.4 – 26.0) Lot 3 |
3.6 |
Dicklex Int. Ltd |
2020-08-01 |
2021-05-31 |
None |
14,910,000.00 |
N/A |
N/A |
|
Western North Region |
Upgrading of Sefwi Bekwai - Eshiem - Asankragwa, Km 10-56 |
46 |
Midwest Contract Works |
None |
None |
None |
65,830,000.00 |
N/A |
N/A |
|
Upper West Region |
Upgrading of Tumu - Welembelle (10km) LOT 4 |
10 |
Bachest (GH) Ltd |
2012-12-18 |
2014-06-17 |
2015-02-18 |
7,045,591.48 |
N/A |
2,746,484.94 |
|
Upper West Region |
Upgrading of Tumu - Welembelle Road (36km) |
36 |
Fuzak Co. (GH) Ltd. |
2016-09-16 |
2019-03-15 |
None |
92,547,915.93 |
N/A |
12,255,599.76 |
|
Volta Region |
Upgrading of Adaklu Abuadi-Adaklu Waya(km 0-12) |
12 |
Delovely Co Ltd |
2020-10-27 |
2022-04-26 |
2022-04-26 |
55,447,873.59 |
55,447,873.59 |
N/A |
|
Volta Region |
Upgrading of Metsrikasa - Havedzi Road: (Km 0 - 10) |
10 |
Kapra/ URC |
2012-11-26 |
2014-10-24 |
2015-03-31 |
10,574,815.00 |
12,292,183.16 |
9,968,012.98 |
|
Northern Region |
Upgrading of Yendi - Saboba (Km 10-50.6) |
40.6 |
Fuzak Company Limited |
2015-11-19 |
2018-11-20 |
None |
68,063,820.00 |
N/A |
33,116,457.23 |
|
Northern Region |
Upgrading of Tamale-Karaga Road (km 3-13) |
10.0 |
Dyget Company Limited |
2016-06-02 |
2018-06-01 |
None |
16,328,997.68 |
N/A |
7,586,571.91 |
|
Northern Region |
Upgrading of Kumbungu - Savelugu Road (km 0.0 - 14.0) Lot 1 |
14.0 |
Q3 Ltd. |
None |
None |
None |
29,678,422.56 |
N/A |
N/A |
|
Northern Region |
Upgrading of Savelugu-Nanton Road (km 0.0-12.0) Lot 3 |
12.0 |
Colonial Properties Ltd. |
None |
None |
None |
37,059,511.18 |
N/A |
N/A |
|
Northern Region |
Upgrading of Tamale-Yendi Road (30km) |
30.0 |
Fuzak Company Limited |
2015-11-19 |
2016-11-20 |
None |
19,878,064.23 |
N/A |
9,994,972.48 |
|
Northern Region |
Upgrading of Saboba - Wapuli(Km 0.0 - 4.0)-Lot 1 |
4 |
New Modern World Co. Limited |
2021-02-05 |
2022-07-04 |
None |
14,980,025.54 |
N/A |
N/A |
|
Northern Region |
Upgrading of Saboba - Wapuli(Km 4.0 - 8.0)-Lot 2 |
4 |
Dynamic Globe Co. ltd |
2021-02-05 |
2022-07-04 |
None |
14,470,101.56 |
N/A |
N/A |
|
Northern Region |
Upgrading of Saboba - Wapuli(Km 8.0 - 12.0)-Lot 3 |
4 |
Timeline & Innovations Ltd. |
2021-02-05 |
2022-07-04 |
None |
14,446,768.27 |
N/A |
N/A |
|
Northern Region |
Upgrading of Saboba - Wapuli(Km 12.0 - 16.0)-Lot 4 |
4 |
Grand Unique Co. Ltd. |
2021-02-05 |
2022-07-04 |
None |
14,995,827.04 |
N/A |
N/A |
|
Northern Region |
Upgrading of Saboba - Wapuli(Km 16.0 - 21.6)-Lot 5 |
5.6 |
New Modern World Co. Limited |
2021-02-05 |
2022-07-04 |
None |
14,976,973.39 |
N/A |
N/A |
|
Greater Accra Region |
Upgrading of Prampram-Anyaman Road (Latsinyo-Anyaman) 10km Lot 1 |
10 |
I. B. Maigida Ltd. |
2012-12-20 |
2013-12-19 |
2020-02-27 |
7,280,000.00 |
24,330,000.00 |
51,600,000.00 |
|
Eastern Region |
Upgrading Of Seventh Day Adventist College Of Education Internal Road Network (4.55 Km) |
4.55 |
N/A |
2020-12-09 |
2021-12-09 |
2021-12-09 |
12,006,718.84 |
12,006,718.84 |
N/A |
|
Greater Accra Region |
Resealing Of Sege - Bator Road (5.3KM) lot 2 |
5.3 |
Win - Mbori Enterprise |
2020-07-29 |
2021-07-29 |
None |
0.00 |
N/A |
N/A |
|